Reconstruction of fishmeal production
Project description. The available equipment was
installed in 1964. The project provides step-by-step reconstruction of plant and replacement of wear equipment. As result the fishmeal quality and production output will be increased and production cost will be reduced.
Needs of investment for project realization:
- 1 stage – $ 805 000;
- 2 stage – $ 805 000;
- 3 stage – $ 1 700 000;
- 4 stage – $ 181 000.
Development phase: business plan; first stage of realization;
Total cost of project: $ 3 600 000;
Needs of investment: $ 3 500 000; internal rental rate (IRR) – 30%;
Proposal for cooperation forms: credit or leasing.
Contact information: Sh. Guseinov (8152) 286963
|
Open joint – stock company |
Tel. / Fax (8152) 286-250 e-mail : atobolev@yandex.ru |
|
General director Finance manager |
Michael Zub Alexey Tobolev (8152) 287979 |
Production of fish sausages
Project description. The project provides the arranging the production of sterilized fish sausages with seaweed-addition (storage life at t0 = +20 – 4 months).
At plant was installed the automatic technological line for production of sterilized fish sausages in vacuum packing. The adjustment of
electronic equipment was carried out; agreements about raw material supplies were concluded; reconstruction of operating areas in according to sanitary requirements is finished.
For realization of project it is necessary to construct a boiler-house for production needs.
Development phase: business plan; first stage
of realization;
Total cost of project: $ 970 000;
Needs of investment: $ 32 000;
Pay-back period: 12 months;
Proposal for cooperation forms: credit on the security of property
or leasing.
Contact information: A. Tobolev (8152) 287-979
|
Joint – stock company Non-alcoholic drinks plant “TONY” |
14, Sovetskaya str., Severomorsk, Tel. / Fax (815-37) 44271 e-mail : tony@severm.mels.ru |
|
General director |
Igor Boldovskiy (815-37) 51263 |
The plant produces non-alcoholic drinks of more than 100 marks for needs of
Development of production facilities
Project description. The project provides the reconstruction of available operation areas and arranging the new plant’s department for increasing the variety of drinks in different packing.
The new plant’s department is intended for desiderating and pouring of vegetable oil, production of mayonnaise and packing of meal,
sugar, cereals, etc.
Development phase: business plan; first stage
of realization;
Total cost of project: $ 355 000;
Needs of investment: $ 210 000;
Pay-back period: 36 months;
Proposal for cooperation forms: credit or leasing.
|
Open joint – stock company |
23, Promyshlennaya str., Tel. / Fax (8152) 435-651 |
|
General director Chief technologist |
Viktor Alyoshin (8152) 435511
Tatyana Zavyalova
(8152) 435777 |
Improvement of grain mill scheme
The main kind of output production is flour of different sorts for bread-making.
Project description. The project provides the
increasing of production output owing to installation of additional technological equipment.
Reduction of production cost will be provided by:
- increasing of production output of high-grade flour by 23%;
- saving of electric and heat power;
- saving of raw materials;
- reduction of personnel.
Development phase: engineering account and
economic calculation;
Total cost of project: $ 362 000;
Pay-back period: 9 months;
Proposal for cooperation forms: part in joint
stock, credit or leasing.
Contact information: T.Zavyalova (8152) 435 777
Air re-circulation on the mill
Brief description of the project. Products
of the grain grinding on the mill are transported vertically with the help of warm air (pneumotransport), which is of certain temperature. After the abstracting of the products warm air is thrown into atmosphere. This allows to install equipment to purify warm air in order to bring it back
to the room.
Retrichment is achieved due to reduction of costs on:
·
air heating
·
equipment main tenance
·
electric power
Development phase:
business-plan;
Total cost of the project: 3 mln. roubles;
Pay-back period: 2,5 years;
Proposal for cooperation forms: credit.
Contact information: Zavialova T.V., (8152) 43-5777
|
Open joint – stock company Severomorsk bread-making plant “Khlebopyok” |
5, Murmanskoe r., Severomorsk, Tel. / Fax (815-37) 42066 |
|
Director |
Albina Efimova (815-37) 42066 |
The main kinds of output production are glazed gingerbreads, waffle cakes, baking rolls, etc.
Introduction of new baking technologies
Project description. The project provides the increasing of variety of
confectionaries and production output owing to introduction of new technological special lines for production of glazed gingerbreads, waffle cakes, baking rolls.
Development phase: engineering account and
economic calculation;
Pay-back period: 12 months;
Proposal for cooperation forms: credit or leasing.
Contact information: A.Efimova, (815-37) 42066
|
Open joint – stock company “Protein” |
Tel. / Fax (8152) 286-224 e-mail : protein@online.ru |
|
Director |
Alexander Vasilyev (8152)
286565 |
Open joint-stock company “Protein” was created on base of pilot plant of protein concentrates in October 1992. Founders: closed joint-stock company
“Arctic Service Fish” – 8,38% of stocks, private individuals – 91,62% of stocks. Main spheres of activity: production of imitated protein products on of fish materials (crab sticks, caviar “Agat”), smoke-dried fish, law-salt fish, fish pastes, mayonnaises production. Stuff size
– 136 persons. Qualified worker have long-term experience in production of imitated protein products and deep processing of hydrobionts.
Arrangement of production of crab imitation products
Project description. Open joint – stock
company “Protein” was founded in 1992. Number of personnel – 136 persons. The main kinds of output production are imitation products on the base of fish raw material (crab sticks, caviar, cold smoked fish, salted fish, mayonnaise, fish livers, seaweed products, etc.).
Arrangement of modern technological lines is intended for increasing of variety output products and reduction of production cost.
Development phase: business plan;
Total cost of project: $ 245 000;
Pay-back period: 12 months;
Proposal for cooperation forms: credit on the security of property.
Creation of pancreatic hydrolyzate production for enterprises
of microbiological industry
Brief description of the project.
Creation of microbiological culture mediums production, that are necessary for diagnostics of infectious diseases, on base cheap fish and fish products. Annual production volume of 175 tons of pancreatic hydrolyzate with sales 23.3 mln.roubles a year is planned. Period of realization of the project- 10 months from start of financing.
In Russia SIA “Culture mediums”(
Development phase : business-plan;
Total cost of the project: 4500 thousand roubles;
Need of investments: 4000 thousand roubles;
Pay-back period : 36 months;
Proposal for cooperation forms: will be discussed.
|
Technical scientific center “Ekobiotek Ltd” |
5/23, of. 610, Vorovskogo str., Tel. / Fax (8152) 288-945 e-mail : ekobiotek@mail.ru |
|
President |
Gennadiy Chilingaryan (8152) 288945;
283787 |
Production of glucose hydrochloride
Project description. Produced preparation is
intended for medicine needs as rehabilitating component for tendons and cartilages. The preparation is made on the base of natural polymer – chitin.
The project provides the arranging the production of this preparation in
Information about production using: production is licensed and
certificated.
Designer’s rights are reserved by Russian patent protection.
Development phase: designed technology;
Pay-back period: 2 years;
Proposal for cooperation forms: investments are necessary for
construction of factory.
|
Joint – stock company “KGBS” |
25 Severniy pr., Tel. / Fax (8152) 267-351 e-mail : kgbs@yandex.ru |
|
General director |
Pavel Vinogradov (8152) 267351 |
Production of biological active food extract
Project description. The biological active food extract “Laminaria plus” is intended for prevention of iodine deficit and some others deceases. Regular dose of extract normalizes the metabolism and increases the intellectual and physical abilities.
The project provides the modern processing of seaweeds saving all vitamin components.
Designer’s rights are reserved by Russian patent protection.
Development phase: extract products are
registered and certificated;
Needs of investment: $ 48 500;
Pay-back period: 12 months;
Proposal for cooperation forms:
participation in production development and distribution of products.
|
State unitary agricultural enterprise “Polyarnye Zori “ |
Polyarnye Zori, Tel. (815-32) 64994 |
|
Director |
V.Zakharov (815-32) 64994 |
Reconstruction of milk processing plant
(output – 2 tons per day)
Project description. The
project provides the installation of milk products technology line including processing and packing. As result the output of high quality products will be increased.
Development phase: business plan;
Proposal for cooperation forms: leasing.
Reconstruction of greenhouse plant
(greenhouse area – 13500 thousands m2)
Project description. The greenhouse plant produces vegetables, greenery, flowers. The project provides the reconstruction of 9 greenhouses (area – 13,5 hectare) including the
introduction of new drop-watering technology and installation of lighting lamps. As result the capacity of greenhouses will be increased and production cost will be reduced by 50%.
Development phase: business plan;
Total cost of project: $
90 000; needs of investment – $ 84 000;
Proposal for cooperation forms: credit or leasing agreement.
|
State unitary agricultural enterprise “Tuloma“ (pedigree stock-breeding) |
Tuloma, Kola district, Tel. (8152) 77236 |
|
Director |
Konstantin Popov (8152)
77236 |
Reconstruction of ventilation systems
Project description. Breeder cattle block was built in 1981 and now available ventilation systems are unfit for use. As result there is high concentration of ammonia in the block
causing the corrosion wear of metal construction and harm influence on the health of personnel. That is why the reconstruction of whole ventilation systems is required. Project provides the arrangement of ventilation systems in other reconstructed working blocks too (e.g. carpenter
department, vacuum station, laundry block, milk plant, etc.).
Development phase: engineering account and economic calculation;
Needs of investment – $ 258 000;
Proposal for cooperation forms: will be discussed.
Contact information: Michail Deryabin (8152) 77-237
Reconstruction of sewage purification structures
for breeder cattle block
Project description. Biological
sewage purification structures with capacity of 200 m3 per day were built in 1981. Because of putting into operation the milk plant in 1992 amount of sewage thrown into Tuloma-river is increased. For protection of the environment it is necessary to reconstruct the sewage
purification station and increase its capacity up to 600 m3 per day.
Development phase: engineering account and economic calculation;
Needs of investment – $ 323 000
Proposal for cooperation forms: will be discussed
Contact information: Michail Deryabin (8152) 77237
|
State farm “Polyarnaya zvezda“ |
Mezhdurechye, Kola district, Tel./ Fax (815-53) 22-663 |
|
Director Assistant director |
Viktor Masalov (815-53) 44241 Nikolay Illarionov (815-53) 44285 |
Construction of calf-house
(with maternity section)
Project description. The
meat and milk products produced by the state farm are in great demand and the production output can be increased. Construction of house for 361 head of calf and block for 65 head of cows was started in 1991 and than was stopped. The project provides the construction completion and output
increasing.
Development phase:
primary stage of realization;
Total cost of project: $
220 000;
Pay-back period: 24 months;
Proposal for cooperation forms: will be discussed.
Contact information: Nikolay Illarionov (815-53) 44285
|
State unitary greenhouse plant “Murmanckiy“ |
Tuloma, Kola district, Tel./ Fax (815-53) 61-660 |
|
Director |
Lyubov Balakireva (815-53) 61660 |
Reconstruction of greenhouse block
Project description. The main kinds of output production are vegetables. The project provides the reduction of power consumption owing to modernization of heating systems and
installation of transparent screens. In winter the electric lighting system is providing.
Development phase: business plan;
Total cost of project: $ 2 300 000;
Proposal for cooperation forms: investment.
|
Agricultural holding “Murmanskiy“ |
25 Promyshlennaya str., Tel./ Fax (8152) 434285 |
|
President |
V.Mazur (8152)
434302 |
Construction of meat-processing plant
(output – 1,5 tons per working shift)
Project description. The project aim is to increase the variety of meat products of
high quality. The investment is necessary for acquirement and installation of technology and refrigerator equipment and completion of finishing works at meat-processing plant.
Development phase:
construction project; primary stage of realization;
Total cost of project: $ 716 000;
Needs of investment: $ 190
000;
Pay-back period: 7 months;
Proposal for cooperation forms:
credit.
|
Joint – stock company Poultry farm “Murmanskaya” |
Molochniy, Kola district, Tel. / Fax (815-53) 22461 |
|
P.P. Director |
G.Berdnikova (815-53) 22421 |
Reconstruction of feed plant
Project description. The main kinds of output production are full-rationed feeds. The project provides the installation of automatic technological complex for continuous producing the feeds of high quality.
Development phase: business plan; construction project;
Total cost of project: $ 323 000;
Needs of investment: $ 226 000;
Pay-back period: 18 months;
Proposal for cooperation
forms: will be discussed.
|
Open joint – stock company “ |
15, Kominterna str., Tel. / Fax (8152) 481-064 |
|
General director |
Alexander Medvedev (8152) 481011 |
Development of icebreaker fleet
Project description. The
project was worked out according to Federal program “Modernization of Russian transport system” and provides:
- completing the building of nuclear-powered icebreaker “50 let Pobedy” (2002 - 2004); needs of investment
– $ 90 000 000;
- prolongation of service-life of available nuclear-powered icebreakers (2002 - 2006); needs of investment – $
47 800 000;
- building of four nuclear-powered icebreakers with rated power of 60 MW (2002 - 2004); needs of investment – $ 974 000 000.
Development phase: engineering account and economic calculation;
business plan;
Proposal for cooperation forms: investment.
Building of universal vessels with deadweight of 5 thousands tons
According to Federal program “Modernization of Russian transport system” it is considered to build 9 universal vessels with deadweight of 5 thousands tons.
The project is supported by means of federal budget.
Development phase: business plan;
Total cost of project: $ 132 000 000;
Proposal for cooperation forms: investment.
|
Marine administration of |
19, Portoviy pr., Tel. / Fax (8152) 42-02-22 e-mail : nik@mmtp.ru |
|
Director Assistant director |
Yuriy Eryomin
(8152) 480310 Vladimir Shtrambrand (8152)
480503 |
Arrangement of terminal complex in
Project description. The
project provides:
- arranging the reception of the cruise passenger liners;
- repairing and putting into operation unused berths;
- arranging the storage at the port area;
- increasing the port’s freight turnover.
As result the variety of activities will be increased. Start of realization – 2005.
Development phase:
engineering account and economic calculation; business plan;
Total cost of project: $ 31 000 000 ($ 7 700 000 will be assigned from federal budget; $ 23 200 000 - private investment);
Proposal for cooperation forms: investment.
Contact information: Vladimir Shtrambrand (8152) 480503
Construction of bunker complex on wharf №20
of
Brief description of the project. The
project provides reconstruction of the wharf and construction of modern bunker complex in
Development phase:
engineering account and economic calculation;
Cost of the project: 600 thousand roubles;
Pay-back period: 8 years;
Proposal for cooperation forms: credit or part in profit (will
be discussed).
|
State unitary enterprise “ |
12, Tralovaya str., Tel. / Fax (8152) 28-65-00 e-mail : mail@mmrp.murmansk.ru |
|
Director |
A.Tkachenko (8152) 477281 |
Reconstruction of oil transfer complex
Project description. The
main kinds of services: receiving the oil products from railway station; storage the oil products; supplying the ships and automobiles by oil products; receiving and purification of the oil contaminated ballast water from vessels.
Available oil transfer complex was built more than 25 years ago and at present its wear is more than 60%.
First stage of reconstruction provides:
- reconstructing the purification structures of pier N1;
- constructing the shower canalization with purification structures;
- constructing the automatic fire – fighting systems at the reservoirs, berths, railway draining areas;
- installation of additional reservoirs with total capacity of 60 thousands tons;
- construction of new railway draining area;
- reconstruction of engineering and technological systems.
Second stage of reconstruction provides:
- mechanization and automation of all operating processes;
- reconstruction of available railway
draining areas, pump station, electric power systems, water supply systems, heating systems, canalization, communication and warning systems;
- installation of additional reservoirs with total capacity of 31 thousands tons;
- constructing the pier N2 for tankers with weight-capacity till 30 thousands tons;
- construction of pump station N3.
Development phase: engineering account and economic calculation;
Total cost of project: $ 133 000 000;
Pay-back period: 60 months;
Proposal for cooperation forms: credit and investment.
Contact information: Anatoliy Khashu (8152) 286996,
Irina Morozova (8152) 284254
|
Gefest Ltd Open joint – stock company “Murmanmorstroy” |
6, Pozdnyakova str., Tel. / Fax (8152) 222-596; (8152) 221-825 |
|
General director (Gefest Ltd) General director (Murmanmorstroy) |
Vyacheslav Gavrilovskiy (8152) 222595 Gennadiy Mamonov (8152)
420797 |
Output products: sand (from own quarry), ferroconcrete anchors, ship’s bridge arrangements, concrete of various marks, solutions.
Reconstruction of berths
purposed for building of container terminal
Project description. At
present the berth facilities and berth areas are used insufficiently. The berth is connected with railway line and it is possible to use the berth as a base for ship’s container transfer. The project provides the arrangement of terminal storage, reconstruction of railway lines,
arrangement of areas for container’s storage. For project investors we offer to use the reconstructed berth jointly.
Development phase: business project;
Total cost of project: $ 516 000;
Needs of investment: $ 300 000;
Pay-back period: 18 months;
Proposal for cooperation forms: joint using the berth, credit, part
in joint stock.
Contact information: Vyacheslav Gavrilovskiy (8152) 222-595,
Valeriy Pavlenko
(8152) 434-521
|
State unitary enterprise “Kandalaksha commercial seaport” |
19, Belomorskaya str., Kandalaksha, Tel. / Fax (815-33) 93-138 e-mail : kmtp@sampo.ru |
|
General Director Chief engineer |
V.Tkach (815-33) 92-163 V.Machulskiy (815-33) 55-574 |
Transfer complex for apatit concentrate
Project description. Transfer complex for apatit concentrate will be built on the base of available berths. Transfer complex consists of: unloading block, storage areas, loading
machines. Complex capacity is 3000 thousands tons per year.
Development phase: engineering account and economic calculation;
Total cost of project: $ 11 000 000;
Needs of investment: $ 10 000 000; internal rental rate (IRR) –
11%;
Proposal for cooperation forms: credit, part in joint stock.
Coal transfer complex
Project description. Coal
transfer complex is provided for receiving the coal from railway; unloading the wagons; storage and loading the coal on ships. Rated capacity is 3000 thousands tons per year. Complex is intended for receiving and loading the ships with weight-capacity of 60 thousands tons. Total complex
area is 4,5 hectare. Total capacity of storage is 140 thousands tons. Complex can be used for transfer other types of dry cargo.
For unloading the coal from wagons in winter the warming room for simultaneous warming of 30 wagons is provided.
Development phase: engineering account and economic calculation;
Total cost of project: $ 41 200 000;
Needs of investment: $ 32 300 000;
Pay-back period: 75 months;
Proposal for cooperation forms: credit, part in joint stock.
Dredging works at fairway
with reconstruction of berths N 1,2,3,4
Project description.
Carrying out the dredging works will be provide the safety receiving the ships with weight-capacity till 60 thousands tons. The project provides the reconstruction of berths purposed for increasing of port capacity and development of new sea transport routes.
Development phase: engineering account and economic calculation;
Total cost of project: $ 5 600 000;
Needs of investment: $ 32 300 000;
Proposal for cooperation forms: credit, part in joint stock.
Construction of deep-water berths N 5, 6
Project description. Construction of deep-water berths is purposed for receiving the ships with high weight-capacity, increasing of port activities and development of new sea transport routes.
Development phase: business project;
Total cost of project: $ 22 600 000;
Proposal for cooperation forms: credit, part in joint stock.
|
Open joint – stock company Airport “ |
Airport, Murmashi, Tel. / Fax (8152) 583-541 e-mail : airport@online.ru |
|
General director Project leader |
Vasiliy Darev (8152) 583254 |
Reconstruction of runway and light signal equipment
Project description. The
project provides:
- restoration of runway including the removing of asphalt coat, repair of cement and concrete coats,
reconstruction of drainage system;
- reconstruction of airfield and reinforcement of airfield’s coatings.
As result safety criterion of flights will be proper.
Development phase: engineering account and economic calculation;
Total cost of project: $ 8 400 000;
Proposal for cooperation forms: will be discussed.
Contact information: Eduard Mikhilovsky (8152) 583278
Widening the area of examine control
for passengers and luggage in airport “
Project description. The project provides widening the area of control for passengers and luggage accordingly to modern safety requirements.
Development phase: engineering account and economic calculation;
Total cost of project: $ 968
000;
Proposal for cooperation forms:
will be discussed.
Contact information: Eduard Mikhilovsky (8152) 583278
|
Open joint – stock company Airport “Kirovsk (Apatity)” Aircraft transport company “ |
Apatity, Tel. / Fax (815-55) 77-369 e-mail : airport@com.mels.ru |
|
Director |
Alexey Tereschenko (81531) 94853 |
Construction of technical complex for aircraft maintenance
Project description. Main kinds of services are aircraft maintenance, transportation of passengers, freights, post sending, etc.
The project provides the construction of technical complex for maintenance of aircrafts (IL-114) based
at airport including building of hangars.
Realization of project ensures the safety of flights.
Development phase: engineering account and economic calculation; business plan; certification;
Total cost of project: $ 1 500 000;
Proposal for cooperation forms: part in joint stock.
|
Affiliate of federal state unitarycompany “Russian radio and television broadcasting net” “ (Affiliate FSUC “RTRBN” “ |
RRTBC,43,Lenin av., Tel. / Fax (8152) 449904 |
|
Director |
Ushakov S. A. (8152) 444018 |
Development of broadcasting in
Brief description of the offer. Main
production: services in television and audio programmes air broadcasting.
Project provides broadcasting development in
In accordance with “Concention of introduction of ground digital television and audio broadcasting in
· creation of multiservicing nets on base of MMDS equipment and their convertion to digital format
in
· modernization of cable TV in microdistrict 301 in
· modernization of the distributing net for TV programmes, “1 kanal” (“first channel”) and
“Kultura” (“Culture”) with the use of digital satellite receiving stations instead of radio-relay links
· construction of radio-relay link
· replacement of obsolete transmitter “Yakor” (TV programme “RTR”) to retranslator in
Kandalaksha
· organization of air broadcasting net for TV programme “TVTS” in decimetric wave band in
Severomorsk, Kirovsk, Kandalaksha
· organization of air broadcasting of additional television programmes NTV, “Culture” in
metric wave band and radioprogramme “Youth channel” in band 100 ÷ 108 MHz in Alakurtti, Tumanny, Teriberka, Ura-Guba.
Development phase: primary stage of realization;
Proposal for cooperation forms: (will be discussed).
Contact information: Morozov V.I., (8152) 44-5647
|
Open joint – stock company “Murmanskturizm” |
29, Burkova str., |
|
Director |
Boris Temkin (8152) 441651; |
Development of active touring – project
«Adventures in Lovozero»
Project description. The project provides the arranging the active kinds of touring (e.g. extreme and ecological touring, hunting, recreation fishing, winter safari on snow-vehicles and deer’s team, winter fishing,
floating, ski tours, etc.).
The project aim is building of main technical center, intermediate bases and reconstruction of available structures. It is considered to
bye the necessary equipment: snow-vehicles, boats, catamarans, cars with high cross-country capability, comfortable buses, boat motors, means of communication, draught deers.
Services of active touring are expected to be popular in
Development phase: business project;
Total cost of project: $ 968 000;
Pay-back period: 3 years; profitableness level is
supposed about 25-30%.
Proposal for cooperation forms: credit, part in joint stock.
|
Joint – stock company “Ponoy river” |
8, Shmidta str., Tel. / Fax (8152) 230 - 070 |
|
Director |
Vladimir Shamyshev (8152) 451499 |
“Lovozero extreme”
Project description. The project aim is the carrying out of touring routes and touring programs for all-the-year-round using. It is provided the available tourist bases and camps situated in the beautiful areas of
Development phase: business project;
Needs of investment: $ 903 000; profitableness level is supposed about 25-35%;
Proposal for cooperation forms: share participation.
Contact information: Vladimir Shamyshev (8152) 451499
|
Company «Hibiny-otdykh» Ltd |
12a, Lenina str., Kirovsk, Tel. / Fax (815-31) 94336 |
|
Director |
Natalya Krotova (815-31) 21419 |
Arrangement of recreation touring complex
on the base of hotel «Hibiny»
Project description. The projects provides creating the comfortable
recreation conditions for Russian and foreign tourists and increasing the variety of touring services.
The recreation complex «Hibiny» consists of hotel for 185 places,
restaurant-building, warmed garage for 5 boxes, ski-lift. Hotel “Hibiny” situated near the mountain Aikuaivencorr was built in 1972. There are restaurant, 2 bars, sauna, sport and training rooms, station of ski-hire, library in the hotel.
Reconstruction of hotel provides: replanning of inner area, replacement of water supply, canalization and heating systems, installation of protective
signaling and fire-alarm system, modernization of telephone communication, substitution of furniture, etc. The arrangement of video-room, solarium, billiard-room, tennis-room and improvement of surroundings are provided too.
Development phase: business project;
Needs of investment: 1 stage – $ 300 000; 2 stage – $ 903 000;
Pay-back period: 36 months; profitableness level is supposed about 25-30%.
Proposal for cooperation forms: credit, participation.
|
Sport committee of Monchegorsk administration |
46a, Komsomolskaya str., Monchegorsk, Tel. / Fax (815-36) 72360 |
|
Head of municipality Head specialist |
Igor Ermakov (815-36) 72300 Svetlana Ermolenko (815-36) 32711 |
Skiing and mountain-skiing touring
Project description. The project aim is modernization of touring complex and development of mountain-skiing touring. For realization of project it is supposed to integrate the mountain-skiing and skiing routes with municipal hotel “Sever” (for 74 places).
There is solarium, hairdresser’s room, massage room, billiard-room in the hotel. Sport inventory will be delivered; instructors for training in mountain-skiing are available; mountain-skiing lift was bought; lighting of routes will be installed. Investment is required for reconstruction
of hotel, installation of mountain-skiing lift, arrangement of routes lighting.
Development phase: business project;
Total cost of project: $ 258 000;
Proposal for cooperation forms: credit, participation.
Contact information: Svetlana Ermolenko (815-36) 32711
|
Open joint – stock company “Region – Nedvigimost” |
32, Spekova str., Kandalaksha, |
|
Manager |
Patrakeev V. N. (81533) 33555 |
Touring development in Kandalaksha
region using existing potential
Brief description of the offer. The project is aimed at attracting tourists to Kandalaksha district for recreation, sport, fishing, hunting, etc. There are all favourable conditions:
mountains suitable for the development of all kinds of mountain-skiing sports, access to the sea gives possibility for the development of aquatic sports and fouring routes. In 90-s projecting of natatorium with sea water started in Luvenga (the project may be restored if financing is
available). The first stage of the work will be realized using existing potential. “Cooperative building” in Luvenga will be used as basic object. It is possible to accommodate 30 persons there. The following rooms are planned: ground floor – bar with a discotheque (for 30 persons),
first floor – restaurant (for 30 persons), second floor – hotel rooms (for 30 persons), basement floor – sauna, billiard-room, sports room and auxiliary rooms. It is necessary to elaborate 2-3 touring routes. The project may be put into practice in the second half of 2005 if
financing is available.
Development phase: business-plan;
Cost of the project: 3 mln. roubles;
Proposal for cooperation forms: credit or participation.
|
Closed joint-stock company “Severnye reki”
“Harlovka” Ltd. |
Tel./Fax (8152) 27-56-28 e-mail: nriver@mail.ru |
|
|
Manager |
Koretskiy V.N. |
(8152) 275658 |
Closed joint-stock company “Severnye reki” works in sphere of touring service, it organizes angling of salmon fish for foreign tourists according to
principle “catch-let” (recreation).
Development of ecological and extremal touring on small rivers
of northern-western cost of
Brief description of the offer. The project’s aim is the development of new kinds of touring, widening of the service’s range, attracting of Russian tourists, improvement of ecological situation, mobilization of foreign investments, including irretrievable investments
from public funds on ecological programmes and creation of positive image of the territory for international touring development. New project provides ecological touring development, rafting, winter touring development (such as ice-fishing and touring on snowmobiles).
Rafting. Rafting is to be
organized on base of existing touring camps and streams infrastructure. It is planned to explore upper and middle parts of the river Runda, the Harlovka, the Vostochnaya Litsa. Taking river’s length and number of fishing places into account it is possible to organize simultaneously week
tour for five groups (of four tourists and one guide each). The best time for rafting is from the end of June to the end of August (nine weeks). It is possible to serve 160-180 tourists in a season.
Winter tours (with ice-fishing) on snowmobiles.
Base camps on the rivers Rynda and Harlovka will be used for accommodation of the tourists. Dayly, tourists with experienced guides will go on snowmobiles to
the fishing places. Fishing places are 5-30 km from the base camps. The duration of a tour – 5 days. Favourable time for winter tours: February – April (about 10 weeks). Weekly 5-6 tourists can be accommodated in base camp. The number of served tourists in a season – 100-120.
Ecological programme. The
programme provides cleaning of the river Harlovka’s estuary from remains of activity of a troop unit ended its deployment in 2001. This programme can be put into practice only under condition that the main programme on salmon fishing will be realized.
Development phase: business-plan;
Needs of investment: 5309 mln.
roubles;
Pay-back period: 7 years,
profitability – 20%;
Proposal for cooperation forms: credit,
participation.